CRF-A · Southern Nevada

Continuity Research Facility Alpha

Neural computation and high-performance computing

Operational status

Operational

Initial operating capability reached 18 August 2026 with 18 MW of IT load installed in Data Hall A; full operating capability is planned for the third quarter of FY2027. (as of October 2026)

Overview

Continuity Research Facility Alpha (CRF-A) is the Department's principal high-performance computing site. It is managed by the Continuity Infrastructure Administration (CIA-DSC) and serves as a shared research resource for all five divisions. The facility occupies a desert site in southern Nevada chosen for its available transmission capacity, low cost of land, high solar resource and low humidity, which together favor dry heat rejection over evaporative cooling.

The site and a partially completed data hall were developed during the period of the Interagency Task Force on Civilizational Continuity (ITFCC) as a federal research computing project. Custody transferred to the Department in April 2026. CIA-DSC completed the installation of the primary system, ALPHA-1, over the following four months, and the facility reached initial operating capability (IOC) on 18 August 2026. Full operating capability (FOC), defined below, is planned for the third quarter of FY2027.

Facility Alpha is the computational anchor of the Continuity Infrastructure Initiative. It produced the 40,000-run ensemble behind the Civilizational Systems Outlook: 2026–2035 and hosts the controlled evaluation enclaves used by the Frontier System Evaluation Program. It is a research facility: it does not operate or control any external infrastructure, and its systems are not connected to the operational networks of any utility, carrier or agency.

Definition of full operating capability

  • Data Hall B power and cooling infrastructure commissioned, bringing installed capacity to the 30 MW design IT load.
  • Tape archive populated and verified to its 1.6 EB rated capacity, with a second copy of designated collections replicated to Facility Bravo.
  • Continuous 24-hour operations staffing and completed security and privacy accreditation for all research enclaves.
  • Operational acceptance of the site energy management system that will dispatch the Phase 2 solar array and battery plant.

Research focus

Allocation of ALPHA-1 time is set each quarter by an allocation committee chaired by the Office of the Chief Scientist, with representation from each division. For FY2027 the allocation is weighted toward three workloads, which together account for about 85 percent of scheduled node-hours.

Table 1. Planned ALPHA-1 allocation, FY2027
WorkloadProgramShare of node-hoursPrincipal resource demand
ICSM production ensembles and sensitivity studiesISMP, LTFP38%FP64 throughput; ensemble scheduling
NCRP emulation benchmark suite and connectome reconstructionNCRP31%Low-precision throughput; parallel storage bandwidth
Frontier system evaluation enclavesFSEP16%Isolated accelerator partitions; audit logging
Methods development, archive verification and reserveAll15%Mixed
Shares are planning figures and are revised quarterly. ISMP: Integrated Systems Modeling Program; LTFP: Long-Term Forecasting Program; NCRP: Neural Continuity Research Program; FSEP: Frontier System Evaluation Program.

Integrated systems modeling

Facility Alpha runs production versions of the Integrated Civilizational Systems Model (ICSM), currently version 4.2, for the Integrated Systems Modeling Program. A full Outlook ensemble of 40,000 runs across 1,280 scenario configurations occupies roughly one-fifth of ALPHA-1 for about eleven days, including post-processing. The model description is published as DSC-TR-2026-003. Every production run is archived with its configuration, input data hashes and code version, so that any published result can be regenerated.

Neural emulation benchmarks

The Neural Continuity Research Program uses Facility Alpha for its emulation benchmark suite, which measures how well neuron-level models of small nervous systems reproduce recorded behavior and physiology. Current benchmarks operate at Emulation Fidelity Level 3 (EFL-3) for C. elegans and for partial Drosophila circuits. The facility also hosts reconstruction pipelines for synaptic-resolution imaging data, whose acquisition requirements are set out in DSC-TR-2026-009. Projections of the compute and energy required for mammalian- and human-scale emulation, which inform the facility’s long-range planning, appear in DSC-TR-2026-008. Those projections are requirements estimates, not commitments, and nothing at Facility Alpha emulates a human or mammalian brain.

Frontier system evaluation

The Office of Advanced Artificial Intelligence conducts structured evaluations of frontier computational systems in physically and logically isolated enclaves at Facility Alpha, following the methodology in DSC-TR-2026-007. Enclaves have no outbound network path; results leave the enclave only through a reviewed export process.

Technical capabilities

ALPHA-1 is a liquid-cooled system of 2,304 compute nodes, each with four accelerators and two host processors, installed in 72 cabinets in Data Hall A. Nodes are connected by a three-level fat-tree interconnect with 400 Gb/s per-accelerator injection bandwidth. At full load the system draws approximately 13.5 MW.

Table 2. ALPHA-1 system configuration
ComponentConfiguration
Accelerators9,216 (2,304 nodes × 4)
Peak FP64 performance~1.1 exaFLOPS
Peak low-precision AI performance~38 exaFLOPS
Cabinets72, direct-to-chip liquid-cooled, ~190 kW each at peak
InterconnectThree-level fat tree, 400 Gb/s per accelerator
Parallel file system410 PB usable, flash and disk tiers
Tape archive1.6 EB rated capacity, two libraries in separate fire zones
Measured sustained power at full load~13.5 MW
Peak figures are theoretical. Sustained performance on ICSM production workloads is reported in DSC-TR-2026-003.

Cooling and water

Compute nodes are cooled by direct-to-chip cold plates on a warm-water loop with a design supply temperature of 32 °C. Heat is rejected to the atmosphere through closed-loop dry coolers. On the hottest days of the year, when ambient temperatures exceed the dry coolers’ approach limit, an adiabatic pre-cooling stage engages; it is expected to operate for fewer than 300 hours per year. The facility uses no cooling towers, and annual makeup water is a small fraction of what an evaporatively cooled facility of the same load would consume. The annual power usage effectiveness (PUE) target is 1.15.

Power

Facility Alpha has a 42 MW contracted grid supply delivered over two independent high-voltage circuits. Storage, networking, cooling controls and building systems are carried by uninterruptible power supplies and standby generation sized at approximately 6 MW. Compute partitions are not on standby generation; during an extended grid outage they are checkpointed and shed in a defined order. Phase 2 adds an on-site 60 MW solar array with a 240 MWh battery plant, now under construction, which will supply a substantial share of daytime load and reduce peak grid draw.

Safety and environmental compliance

Facility Alpha was sited and built under the applicable federal environmental review process, including surveys of desert habitat and cultural resources before the solar array footprint was cleared. Construction and operations follow applicable federal occupational safety, fire protection and hazardous materials requirements. The battery plant is being built with separated enclosures, thermal runaway detection and setbacks agreed with the regional fire authority.

Specifications

Location
Southern Nevada
Site area
Approx. 260 ha, of which approx. 140 ha reserved for the solar array
Grid supply
42 MW contracted, two independent high-voltage circuits
Design IT load
30 MW (18 MW installed in Data Hall A at IOC; 12 MW in Data Hall B at FOC)
Cooling
Direct-to-chip liquid cooling, 32 °C supply; closed-loop dry coolers with adiabatic trim on peak days
Annual PUE target
1.15
Primary system
ALPHA-1: 9,216 accelerators in 2,304 nodes, 72 cabinets
Peak performance
~1.1 exaFLOPS FP64; ~38 exaFLOPS low-precision AI
Parallel storage
410 PB usable
Tape archive
1.6 EB rated capacity
Critical-load backup
UPS and approx. 6 MW standby generation for storage, network, cooling controls and building systems
On-site renewable supply (Phase 2)
60 MW solar array with 240 MWh battery storage; under construction
Water use
Closed-loop process cooling; makeup water limited to adiabatic trim and domestic use
Staffing
Approx. 410 federal and contractor personnel
Managing office
Continuity Infrastructure Administration (CIA-DSC)

Operational status and milestones

Managed by the Continuity Infrastructure Administration.

Facility milestones
DateMilestoneStatus
November 2025ITFCC final report (ITFCC-2025-07) recommends a dedicated federal computing site for long-horizon systems modelingComplete
April 2026Site and partially completed Data Hall A transferred to the Department; first ALPHA-1 cabinet group supports ICSM v4.0 baselining under early accessComplete
June 2026Installation of all 72 ALPHA-1 cabinets completedComplete
July 2026ALPHA-1 acceptance testing completedComplete
18 August 2026Initial operating capability (18 MW IT load installed)Complete
September 2026ICSM v4.2 production ensemble (40,000 runs) completed for the 2026 OutlookComplete
Q2 FY2027Data Hall B power and cooling commissioningPlanned
Q3 FY2027Full operating capability (30 MW design IT load)Planned
Q4 FY2027Phase 2 solar array and battery plant energizedPlanned
2031–2034 (planned)Human-scale emulation compute demonstrator for NCRP Phase III, subject to program and RERB/ESAB reviewPlanned