CRF-B · Colorado Front Range (subsurface)

Continuity Research Facility Bravo

Underground archival and computational research infrastructure

Operational status

Partially Operational

Archive Level 1 was commissioned in June 2026 and is in service; the 8 MW compute hall is under fit-out, with completion planned for mid-2027. (as of October 2026)

Overview

Continuity Research Facility Bravo (CRF-B) is constructed within a repurposed former hard-rock mine on the Colorado Front Range. Its working levels lie beneath 140 to 190 meters of crystalline rock. The facility serves two functions: it is the Department's primary archive for research data, model records and preserved collections, and it will host a compute hall that operates independently of Facility Alpha.

Underground siting provides stable temperatures, physical protection and separation from surface weather, wildfire and most forms of accidental damage. It also brings obligations that surface facilities do not have, including ground control, ventilation, radon management, mine water treatment and underground fire and egress safety. The design choices described below follow from both.

Rehabilitation of the mine workings, including ground support and drainage restoration, began in 2025 under an interagency preservation pilot during the ITFCC period. The site transferred to the Department in February 2026. Archive Level 1 was commissioned in June 2026 and has been operated since then under the Long-Duration Information Preservation Program (LDIPP). On 1 September 2026 the Continuity Infrastructure Initiative was expanded to include Facility Bravo, bringing the compute hall fit-out and the site's remaining construction under the same program that delivered Facility Alpha.

Former mine use

Mining at the site ended decades before the Department acquired it. Historic workings outside the facility envelope have been surveyed, sealed or isolated by engineered bulkheads, and are not used. Legacy surface disturbance is being reclaimed as part of the site environmental program.

Research focus

Primary archive

Archive Level 1 holds the Department's authoritative preservation copies: ICSM release packages and production run records, NCRP reference datasets, published reports and their underlying data, and administrative records designated for permanent retention. Each collection is held on at least two media types. Fixity (checksum) verification runs continuously on the tape tier, and a scheduled sample of optical and microfilm holdings is inspected each quarter. Media choices follow the assessment in DSC-TR-2026-005.

The Neural Data Preservation Framework, released for comment as DSC-TR-2026-011, identifies Facility Bravo as the primary preservation site for neural datasets that meet its packaging and provenance requirements. Under the draft framework, neural data would be held in Bravo’s access-controlled enclave, with a second copy at Facility Charlie.

Hardened computation research

The compute hall, when complete, will run three classes of work: a continuously maintained replica of the ICSM production environment, so that the model can be executed if Facility Alpha is unavailable; large-scale integrity verification of the archive; and NCRP data processing that benefits from co-location with the archive. CIA-DSC will also use the hall to study how computing systems behave over long periods in a stable underground environment, including component failure rates, corrosion and the energy cost of heat rejection to rock. Requirements for the hall are derived in DSC-TR-2026-008.

Technical capabilities

Table 1. Underground facility zones
ZoneApprox. floor areaEnvironmentStatus (October 2026)
Archive Level 1: tape vault2,900 m²15 °C ±1 °C, 35% RHIn service (commissioned June 2026)
Archive Level 1: optical and microfilm vaults1,300 m²15 °C ±1 °C, 35% RH; sealed cabinetsIn service
Archive Level 1: ingest and inspection1,000 m²Conditioned; clean handling areaIn service
Compute hall3,800 m²Liquid-cooled, 8 MW ITUnder fit-out; completion planned mid-2027
Plant, ventilation and refuge spaces5,000 m²VariesPartly complete
Areas are usable floor area at the working levels, which lie between 140 and 190 m below the surface.

Archive environment

Archive Level 1 is held at 15 °C ±1 °C and 35 percent relative humidity. Surrounding rock at the working levels holds a near-constant temperature close to that set point, so the conditioning plant mostly removes moisture and the small heat load from tape libraries and lighting. Capacity is approximately 120 PB on tape, plus separate vaults for archival optical discs and microfilm. Microfilm cabinets are sealed, and the vault is fitted with acid-gas and particulate filtration.

Heat rejection

The compute hall uses geothermal-assisted heat rejection. A closed-loop ground heat exchanger, drilled into the rock mass away from the archive, absorbs part of the heat load. The rest is carried to surface dry coolers. Instrumented boreholes monitor rock temperature around the loop, and its share of the load is limited so that the rock near the archive does not warm measurably. When the hall is complete, its design-basis PUE will be 1.2.

Power and resilience

The site is served by two independent utility feeds from separate substations. On-site generation at the surface is sized to carry the full site load, including the completed compute hall, ventilation and hoisting, for 72 hours without resupply. Fuel is stored only at the surface. Generators are arranged N+1, and the archive is on separate uninterruptible power supplies and switchgear so that faults in the compute hall cannot propagate to it.

Underground safety and environmental compliance

Underground operations follow applicable federal and state mine safety and occupational health requirements. The working levels are reached by a vehicle portal adit, and a vertical shaft with a personnel hoist provides a second means of egress. Ground conditions are monitored with extensometers and convergence stations and maintained with rock bolting and shotcrete. Ventilation is supplied through dedicated intake and exhaust airways. Radon, carbon monoxide and oxygen are monitored continuously, and pre-stocked refuge stations are located on each working level. The archive vaults use inert-gas fire suppression and the compute hall uses water mist. Mine water is collected, treated at the surface and discharged under the site’s environmental permits.

Specifications

Location
Colorado Front Range (subsurface)
Site type
Repurposed former hard-rock mine in crystalline rock
Depth
Working levels at 140–190 m overburden
Access and egress
Vehicle portal adit; vertical shaft with personnel hoist as secondary egress
Usable underground area
Approx. 14,000 m² at the working levels
Surface site area
Approx. 45 ha
Archive Level 1
Commissioned June 2026; 15 °C ±1 °C, 35% RH
Archive capacity
Approx. 120 PB on tape, plus optical and microfilm vaults
Compute hall
8 MW IT load; under fit-out, completion planned mid-2027
Heat rejection
Geothermal-assisted: closed-loop ground heat exchanger with surface dry coolers
Utility power
Dual independent utility feeds from separate substations
On-site generation
72 hours at full site load; N+1 surface generator plant, fuel stored at surface
Ventilation and air quality
Dedicated intake and exhaust airways; continuous radon, CO and O₂ monitoring
Fire protection
Inert-gas suppression in archive vaults; water mist in compute hall; refuge stations on each level
Staffing
Approx. 160 federal and contractor personnel, rising to approx. 230 at compute hall completion

Operational status and milestones

Managed by the Continuity Infrastructure Administration.

Facility milestones
DateMilestoneStatus
2025Rehabilitation of mine workings and drainage begun under an interagency preservation pilotComplete
February 2026Site transferred to the DepartmentComplete
May 2026Long-Duration Information Preservation Program established; Bravo designated primary archiveComplete
June 2026Archive Level 1 commissionedComplete
1 September 2026Continuity Infrastructure Initiative expanded to Facility BravoComplete
October 2026First complete replication of ICSM v4.2 release and run records from Facility Alpha verifiedComplete
Q2 FY2027Ground heat exchanger loop and surface dry coolers commissionedPlanned
Mid-2027Compute hall (8 MW) completion and acceptancePlanned
FY2028Archive Level 2 feasibility and geotechnical studyPlanned