DSC-TR-2026-008Technical Report
Energy and Compute Requirements for Large-Scale Neural Emulation
Continuity Infrastructure Administration
A work of speculative fiction. The Department of Strategic Continuity is not a real government agency, and this is not a government website. About this project
Research program · CII
The Continuity Infrastructure Initiative (CII) is the engineering program through which the Department plans, builds and operates its research facilities. It is led by the Continuity Infrastructure Administration, with the Directorate of Neural Continuity as principal partner and largest prospective user of its computational capacity.
The Initiative began in April 2026, when the site of Facility Alpha in southern Nevada was transferred to the Department. Alpha reached initial operating capability on 18 August 2026 with 18 MW of IT load installed against a 30 MW design, and now hosts ALPHA-1, the Department’s primary computing system, together with ICSM production runs and the NCRP emulation benchmark suite. On 1 September 2026 the Initiative was expanded to include Facility Bravo, a subsurface archival and computational facility on the Colorado Front Range, and Facility Charlie, a long-duration preservation facility in interior Alaska.
CII treats each facility as a research subject as well as an asset. The Department’s work requires infrastructure that can operate through prolonged disruption to external supply and that can be maintained by future staff who did not build it. Few existing facilities are designed against those requirements. The Initiative studies power, cooling, construction and operations practice with that horizon in mind, and publishes its findings so that they are available beyond the Department.
The Initiative’s compute and energy planning for large-scale neural emulation is documented jointly with DNC in DSC-TR-2026-008.
Select a research area to read a summary of current work.
Layout, power distribution and direct-to-chip liquid cooling for accelerator systems at the density of ALPHA-1, and the design margins needed to accommodate hardware generations not yet specified.
Integration of contracted grid supply, on-site generation and storage so that facilities can sustain priority loads through grid disturbances. Alpha’s solar and battery installation and Bravo’s dual feeds with 72-hour on-site generation are the principal test cases.
Heat rejection suited to each site: dry coolers in Alpha’s arid climate, geothermal-assisted rejection at Bravo’s subsurface levels, and passive thermal stability for Charlie’s archival vaults, which are built on engineered foundations rather than relying on permafrost.
Engineering for working levels at 140–190 m overburden at Bravo, a repurposed former hard-rock mine, including ground support, ventilation, water management and long-term structural monitoring.
Maintenance regimes, spare-parts strategy, documentation standards and staffing models for facilities intended to operate over several decades, developed with OLSR’s institutional design research.
Status as of October 2026.
April 2026 Complete
Site in southern Nevada transferred to the Department; Initiative established.
18 August 2026 Complete
ALPHA-1 entered service with 18 MW of IT load installed.
1 September 2026 Complete
Initiative scope extended to the subsurface Colorado facility and the interior Alaska preservation facility.
Q3 FY2027 In Progress
Remaining IT load installed toward the 30 MW design; solar and battery Phase 2 under construction.
Mid-2027 – 2028 In Progress
Fit-out of Bravo’s 8 MW compute hall (mid-2027) and construction of Charlie’s main vault (2028).
DSC-TR-2026-008Technical Report
Continuity Infrastructure Administration
DSC-TR-2026-005Technical Report
Continuity Infrastructure Administration
DSC-ADM-2026-001Policy and Administrative
Office of the Secretary
CRF-A
Neural computation and high-performance computing
The Department's primary computing site. Facility Alpha hosts the ALPHA-1 system, runs production ensembles of the Integrated Civilizational Systems Model, and carries the Neural Continuity Research Program's emulation benchmark suite. Initial operating capability was reached on 18 August 2026.
CRF-B
Underground archival and computational research infrastructure
A subsurface research facility built in a repurposed former hard-rock mine. Facility Bravo holds the Department's primary archive at 140–190 m of rock overburden and is fitting out an 8 MW compute hall for redundant computation and archive verification.
CRF-C
Long-duration information preservation and redundant systems research
A cold-climate preservation site in interior Alaska, designed so that archival media survive more than a century without power. A pilot vault has operated since July 2026, and construction of the main vault is under way with completion planned for 2028.