Working Paper · DSC-WP-2026-012

Planning Under Deep Uncertainty: Methods for Multi-Decade Continuity Planning

Office of Long-Term Systems ResearchFinal

Fictional document

This publication is part of strategiccontinuity.org, a work of speculative fiction. Its findings, data and conclusions are invented and are not real research. See About this project.

Document information

Identifier
DSC-WP-2026-012
Document type
Working Paper
Date
29 September 2026
Status
Final
Length
46 pages (print edition)
Distribution
Approved for public release; distribution unlimited.

Abstract

The Department makes commitments whose consequences extend over decades: research programs with phases running into the 2030s, facilities designed for a century of service, and archives intended to remain readable after the institutions that created them have changed beyond recognition. This working paper examines how such commitments can be made responsibly when the relevant futures cannot be assigned reliable probabilities. It distinguishes levels of uncertainty, describes robust decision making and adaptive pathways with worked examples drawn from long-duration archiving and facility power supply, and proposes a framework of signposts and pre-agreed triggers for revising plans as conditions change. It considers how long-horizon forecasts can be verified when their outcomes will not be observed for many years, recommending a registry of time-stamped projections scored on a fixed schedule. It sets out a graded posture for acting on projections of high consequence, distinguishing low-probability from high-probability cases and model-conditional from unconditional probability. Finally, it proposes nine design principles for institutions intended to persist across decades. The paper is offered for discussion and does not represent official Departmental policy.

Keywords

  • deep uncertainty
  • robust decision making
  • adaptive pathways
  • signposts and triggers
  • scenario discovery
  • forecast verification
  • forecast registry
  • low-probability high-consequence risk
  • institutional longevity
  • continuity planning

11. Introduction

Working Paper

Working Papers present research in progress by Departmental staff for discussion and comment. The methods and recommendations in this paper are those of its authors in the Office of Long-Term Systems Research and the Office of Strategic Risk Assessment. They do not represent official Departmental policy and have not been adopted as Departmental procedure.

Most planning methods assume that the planner can describe the range of possible futures and attach probabilities to them. For many of the decisions the Department faces, neither assumption holds. A choice of archival media for Continuity Research Facility Charlie, designed for unpowered survivability of more than a hundred years, must be made without knowing which reading technologies will exist in 2126. A research program with phases running to 2034 and beyond must be designed without knowing what its early phases will find. A systemic risk assessment must be acted upon without knowing whether the model that produced it is structurally right.

This paper is about making such decisions well. Its central argument is simple: where the future cannot be predicted with confidence, the aim of planning should shift from choosing the option that is best for the most likely future to choosing options that perform acceptably across many futures, that can be adjusted as the future reveals itself, and that are owned by institutions capable of making the adjustments. The paper takes these three requirements in turn — robustness, adaptivity and institutional persistence — and between them addresses the verification of long-range forecasts and the question of how the Department should act on projections of severe outcomes.

22. Levels of uncertainty

Uncertainty is described as deep when the parties to a decision do not know, or cannot agree on, the model that relates actions to consequences, the probability distributions over key inputs, or the value of the outcomes. Deep uncertainty is not simply wide uncertainty. A quantity can be very uncertain yet well characterized, as the outcome of a fair die is; a quantity can be narrowly bounded in every expert’s estimate and yet deeply uncertain, if the experts’ estimates rest on models none of which can be tested in the relevant regime.

Table 1. Levels of uncertainty and appropriate methods
LevelCharacterizationAppropriate methodsDepartmental example
1A single future with bounded errorPoint forecast with sensitivity analysisElectricity demand at Facility Alpha over the next 12 months
2Alternative futures with defensible probabilitiesProbabilistic forecasting; expected-value optimizationFailure rates of LTO tape cartridges over a seven-year service life
3Several plausible futures that can be ranked but not reliably quantifiedScenario analysis; stress testingAccelerator supply lead times over five years
4Many plausible futures that cannot be ranked; contested modelsRobust decision making; adaptive pathwaysCoupled systemic stress over ten years; institutional capacity over three decades
5Recognized ignorance: futures and mechanisms not yet conceivedDiversity, redundancy, reversibility; institutional capacity to learnReading technologies and custodial institutions a century hence

The level is a property of a question, not of a domain. The Department’s systemic risk assessments contain all five: monthly nowcasts of energy reserve margins are Level 1 or 2; the behavior of governance systems under stress never observed in the calibration record is Level 4. A frequent error is to carry the confident methods appropriate to the lower levels into questions at the higher ones, often because the same model produces answers to both.1

33. Robust decision making

Robust decision making (RDM) reverses the usual order of analysis. Rather than first agreeing on a forecast and then optimizing against it, the analyst first proposes candidate strategies and then searches across a large ensemble of futures for the conditions under which each strategy fails. The method proceeds in four steps: framing the decision by its uncertainties, levers, relationships and measures of performance; generating a large ensemble of futures by sampling uncertain factors without assigning them probabilities; using statistical scenario discovery to identify the regions of that ensemble in which a strategy fails; and comparing strategies by the size and plausibility of their failure regions and the costs of reducing them.

Worked example: replication strategy for a century-scale archive

The authors applied RDM, with staff of the Long-Duration Information Preservation Program, to a stylized version of a real design question: how to replicate a 20 PB reference corpus so that it remains complete and interpretable for 100 years. Four strategies were compared across 5,000 futures generated by sampling nine uncertain factors, including media failure rates, the duration of any interruption in funding (0–15 years), the interval before reading equipment for each medium becomes unobtainable, the loss of one or more sites, and the loss of the staff knowledge needed to interpret encoded data.

Table 2. Archive replication strategies across 5,000 futures
StrategyDescriptionFutures retaining ≥ 99.9% of corpus at 100 yearsRelative 100-year costMaximum regret (cost-equivalent)
ATwo sites; active tape with scheduled migration every seven years41%1.003.8
BThree sites; active tape plus offline silica glass78%1.351.6
CAs B, plus human-readable microfilm of encoding documentation and a priority subset, with one unpowered site91%1.520.9
DAs C, with migration and replication decisions governed by signposts and triggers (Section 5)94%1.580.7
Costs are relative to Strategy A and discounted at 2 percent per year. Regret is the shortfall of a strategy relative to the best strategy in each future, converted to cost-equivalent units, maximized over futures. The example is illustrative and does not describe the configuration adopted by the Department.

Scenario discovery explains the results. Strategy A fails principally in futures where funding is interrupted for more than four years: active tape survives only as long as someone migrates it. A single rule — a funding interruption longer than four years combined with reader obsolescence within 15 years — describes 83 percent of Strategy A’s failures with a precision of 0.91. Strategy B removes most of these failures by adding a medium that does not depend on scheduled migration. The residual failures of B and C are of a different kind: they occur where the data survive but the knowledge needed to decode them does not. That is not a media problem but an institutional one, and it motivates both the human-readable documentation in Strategy C and the discussion of institutional longevity in Section 8.

The example illustrates the main practical benefit of RDM. It does not identify an optimal strategy; it identifies what each strategy is vulnerable to, in terms concrete enough for decision-makers to judge whether those vulnerabilities are acceptable.2

44. Adaptive pathways

Robust strategies can be expensive if they must be robust from the outset. Adaptive pathways reduce this cost by recognizing that most long-lived systems are built and operated as sequences of decisions, not as single choices. The method identifies, for each available action, its adaptation tipping point — the change in conditions at which the action no longer meets its objectives — and maps the sequences of actions that can follow one another as tipping points are reached. A pathway map makes visible which near-term actions keep the most future options open and which lock in a single route.

Illustration: compute power supply

The authors developed an illustrative pathway map, with Continuity Infrastructure Administration engineering staff, for the objective of sustaining ICSM production and the NCRP emulation benchmark suite at Facility Alpha through the 2030s. Alpha has 42 MW of contracted grid supply against a design IT load of 30 MW and a target annual power usage effectiveness of 1.15, giving a design facility demand of about 34.5 MW. The map is a planning illustration and not a statement of facility plans.

Table 3. Illustrative adaptation pathway for compute power supply
ActionObjective met until (adaptation tipping point)Lead timeSignpost monitored
1. Contracted grid supply aloneRegional grid curtailment exceeds 40 hours per year, or IT load exceeds 30 MWIn placeCurtailment hours; regional reserve margin
2. Add on-site 60 MW solar array and 240 MWh battery storageCurtailment events exceed 8 hours duration more than twice a year18–30 months (Phase 2 under construction)Duration distribution of curtailment events
3. Add workload flexibility: defer non-critical ensemble members during grid stressDeferrable share of workload falls below 25%3–6 monthsShare of workload classed as deferrable
4. Add firm on-site generationFuel supply interruptions exceed on-site storage36–60 monthsRegional fuel supply reliability
5. Replicate critical workloads to a second facilityNot reached within planning horizon12–24 months after host compute is availableReadiness of Facility Bravo compute hall
Actions are cumulative. Lead times are the authors’ estimates for planning purposes.

The pathway shows that the decision of most consequence is not whether to add firm generation — which can be deferred until its signpost moves — but whether to preserve the workload flexibility of Action 3. If ensemble scheduling is designed in a way that makes every run time-critical, Action 3 disappears and the pathway jumps directly from Action 2 to the expensive and slow Action 4. Decisions that appear to be about software scheduling can thereby foreclose options in energy infrastructure. Finding such couplings is a principal purpose of the method.

55. Signposts and triggers

Adaptive plans fail most often not in analysis but in execution: the signpost moves, and nobody acts, because the action was never agreed in advance or because acting requires an admission that the original plan was wrong. The authors therefore recommend that every adaptive plan specify, before adoption, its signposts (the indicators monitored), its triggers (the threshold values at which action is required) and its pre-agreed responses (what is done, by whom, and within what period). Responses are of four kinds: defensive (protect the plan’s objectives), corrective (adjust the plan), capitalizing (take advantage of favorable change) and reassessment (reopen the plan entirely).

Table 4. Illustrative signposts and triggers for Departmental continuity planning
SignpostIndicatorTriggerPre-agreed responseType
Systemic stressGlobal CSSI nowcast, 12-month mean≥ 60Formal reassessment of continuity planning assumptions within 90 daysReassessment
Grid–computation couplingDependence of energy on computation, as measured in DSC-TR-2026-010≥ 0.70Expand evaluation of grid-control deployments; advise operators on manual fallback exerciseDefensive
Accelerator supplyQuoted lead time for accelerator procurement> 18 monthsAdvance procurement and life-extension planning for installed systemsCorrective
Archival media integrityUncorrectable errors per petabyte in fixity audits> 2 × baseline in two consecutive auditsAccelerate migration of affected media generationCorrective
Knowledge continuityShare of critical roles with fewer than two trained successors> 20%Fund overlapping appointments; document procedures to archive standardDefensive
Glass storage readinessIndependent read verification of silica glass pilot mediaTwo-year verification passedExpand glass share of offline replicationCapitalizing
Thresholds are illustrative and have not been adopted.

Two design rules make such a system durable. Triggers should be set where a reasonable person would have agreed in advance to act, not where action becomes unavoidable. And responsibility for each response should rest with a named office, not with the body that drafted the plan, so that the plan’s authors are not the only people able to declare it in need of revision.

66. Verifying long-horizon forecasts

A ten-year forecast cannot be scored for ten years, and the institution that issued it will by then have issued nine more. Without deliberate design, long-horizon forecasting escapes accountability almost entirely. The authors propose a layered approach in which each horizon is verified by the means available to it.

Table 5. Verification approaches by forecast horizon
HorizonExample quantityVerification approachEarliest scoring
0–2 yearsCSSI nowcast and 12-month projectionProper scoring rules (continuous ranked probability score) against reconstructed values; reliability diagramsAnnually
2–5 yearsModule indicators such as cereal stock-to-use ratio or accelerator lead timeRegistered forecasts scored at horizon; interim tracking of drift between successive forecastsFrom 2028
5–10 yearsProbability of entry into the systemic breakdown regimeScoring of the short-horizon components on which the projection depends; hindcast and process validationPartial from 2027; full at horizon
10–50 yearsInstitutional capacity; archival readabilityStructural validation; historical analogues; tracking of forecasters’ record on shorter horizonsIndirect only
50+ yearsSurvival of records and their interpretabilityNone feasible; plans judged by robustness criteria rather than forecast accuracyNot applicable

The core of the approach is a forecast registry: a time-stamped, immutable record of every quantitative projection the Department publishes, with the model configuration, assumptions and scoring rule fixed at the time of registration. Registry entries would be scored on a published schedule, and the scores published whether favorable or not. The registry should be stored on the Department’s archival infrastructure so that the record of what was forecast survives longer than the people who made the forecasts.3

Long-horizon risk forecasts face a further difficulty: they are intended to change the outcome they describe. If a projection of systemic stress prompts action that reduces stress, the projection will appear to have been wrong. The authors recommend that each registered projection state explicitly the response assumptions on which it is conditioned — for example, “no response beyond that represented in the model’s stylized policy rules” — so that later assessment can distinguish a forecast that was mistaken from one that was conditional on a course of events that did not occur. This does not fully resolve the problem, but it makes the conditionality auditable.

77. Acting on projections of severe outcomes

The Department’s mandate requires it to act on projections of outcomes that would be severe if they occurred. The appropriate response depends on two quantities that are often conflated: how probable the model judges the outcome to be, and how much confidence there is in the model. A probability produced by a model is a model-conditional probability. It becomes an estimate of real-world probability only after accounting for the chance that the model is structurally wrong, which in the regimes of most concern cannot itself be quantified with any precision.

Table 6. Graded posture for high-consequence projections
Model-conditional probabilityPostureCharacteristic actions
Below 5%HedgeMonitor signposts; preserve options; undertake low-regret preparations whose cost is small relative to consequence
5–30%PrepareBuild capacities with long lead times; stage commitments so that they can be expanded or withdrawn as signposts move
30–60%PlanTreat the outcome as one of the principal planning cases; allocate resources explicitly to both prevention and continuity
Above 60%CommitAdopt the outcome as the primary planning baseline, subject to independent review and to stated reassessment triggers
Posture assumes consequences severe enough to impair critical systems across multiple regions. Thresholds are proposals for discussion. Moving to a higher posture on the basis of a single model result should require independent review of that result.

Low probability, high consequence

For low-probability projections, the familiar risks are neglect and its opposite, fixation. The paper recommends that such projections be handled as portfolio items: each is assigned signposts and a small budget for low-regret preparation, and the portfolio as a whole is reviewed annually so that attention is distributed by expected consequence and by the ambiguity of the estimate rather than by the vividness of the scenario. Because the probability of any one such outcome is low but the number of them is large, the combined probability that at least one occurs over a multi-decade horizon may be substantial.

High probability, high consequence

The harder case, and the one the Department now faces, is a projection that a high-consequence outcome is more likely than not within the planning horizon. The Office of Strategic Risk Assessment’s first Civilizational Systems Outlook, due for release in October 2026, is expected to present results in this range. The authors offer five observations.

  1. State both probabilities. Publications should report the model-conditional probability, a qualitative statement of structural confidence, and the specific validation limits behind that statement. A probability without its structural caveat overstates what is known; a caveat without the probability understates what the model shows.
  2. A high projected probability strengthens the case for prevention. Where an outcome is projected for the late 2020s or early 2030s, the window for reducing its likelihood is finite and closing. High-probability projections are a reason to bring prevention forward, not to abandon it.
  3. Pursue two tracks together. Actions that reduce likelihood (evaluation of automated control, diversification at chokepoints, strengthening of manual fallback) and actions that reduce consequence (continuity infrastructure, preservation of knowledge and records) are complements, not alternatives. Neither should be described as a substitute for the other.
  4. Guard against fatalism. Preparation for an outcome is not a prediction that it is inevitable, and public communication should not allow it to be read as one. Calm, specific and uncertainty-explicit communication reduces the risk that a projection becomes self-fulfilling through loss of confidence.
  5. Commit with reassessment built in. Adoption of a severe outcome as a planning baseline should carry its own triggers for reassessment in both directions, so that the Department is as prepared to stand down commitments as it was to make them.

88. Institutional longevity

Every plan discussed in this paper presumes an institution capable of carrying it out over decades: of monitoring signposts, honoring triggers, migrating media and remembering why decisions were made. Long-lived institutions are rare. Most organizations do not survive the people who founded them in recognizable form, and many that do survive have lost their original purpose. The authors reviewed the design of organizations that have sustained a function over a century or more — certain universities and religious communities, scientific bodies maintaining long observational records, standards organizations, and repositories of seeds and genetic material — and the record of public institutions that did not persist. From this review they propose nine design principles.

Table 7. Design principles for long-lived institutions
PrincipleFailure mode addressedPossible Departmental application
1. Fix the purpose; keep methods revisableMission drift, or ossification of outdated methodsDistinguish charter mission from program design; review programs on a five-year cycle
2. Overlap generationsLoss of tacit knowledge at retirement or turnoverAt least two trained successors for each critical role; overlapping appointments
3. Record dissentGroupthink and unexamined assumptionsPublish dissenting opinions of review bodies alongside findings
4. Earn legitimacy openlyWithdrawal of public and political supportPublish methods, results and forecast scores, including unfavorable ones
5. Insulate core functions from funding interruptionLoss of capability during budget lapsesMaintain a minimum-continuity operating plan for archives and critical models
6. Distribute assetsLoss of a single siteGeographically separated facilities with independent utilities
7. Schedule self-renewalGradual obsolescence without a moment of decisionPeriodic independent review of whether each program should continue, change or end
8. Make records interpretable without the institutionSurvival of data whose meaning has been lostHuman-readable documentation of encodings and context stored with the data
9. Limit complexity to what can be sustainedRising maintenance costs that exceed the value of added structurePrefer simpler designs where performance is comparable; account for maintenance burden in every expansion

The ninth principle deserves emphasis because it runs against institutional instinct. Organizations facing growing problems tend to respond by adding structure — offices, procedures, systems — each of which carries a permanent maintenance cost. Over long periods, that accumulated cost can come to exceed the benefit the structure provides, leaving the institution brittle precisely when it most needs to adapt. A Department whose mission is continuity should be particularly attentive to its own complexity.

The second and eighth principles connect directly to the archive example in Section 3, whose residual failures were losses of knowledge rather than of data. The authors suggest that knowledge continuity be treated as an engineered property of the Department, with its own signposts (Table 4), in the same way that media durability is treated as an engineered property of its archives.4

99. Recommendations for discussion

  1. Classify the principal uncertainties in each major Departmental plan by level (Table 1), and apply probabilistic optimization only to questions at Levels 1 and 2.
  2. Require that plans with horizons beyond ten years be tested by robust decision making or an equivalent method, and that their principal vulnerabilities be stated in plain terms in the plan itself.
  3. Express continuity infrastructure plans as adaptive pathways, identifying near-term choices that preserve or foreclose later options.
  4. Adopt signposts, triggers and pre-agreed responses for each adaptive plan, with responsibility for each response assigned to a named office.
  5. Establish a Departmental forecast registry, stored on archival infrastructure, with scoring on a published schedule beginning in 2027.
  6. Report model-conditional probabilities together with explicit statements of structural confidence, and adopt a graded posture (Table 6) for acting on high-consequence projections.
  7. Treat knowledge continuity as an engineered property of the Department, and review its institutional design against the principles in Table 7 at least once every five years.

Comments on this paper are invited from Departmental staff, the External Scientific Advisory Board and the Model Review Panel. A revised version will be prepared in 2027 in light of comments and of experience with the first Civilizational Systems Outlook.

Notes

  1. 1.The Integrated Civilizational Systems Model reports results for all these questions from a single ensemble. Its documentation distinguishes the regimes in which the model has and has not been validated; see DSC-TR-2026-003, Section 7. ↩
  2. 2.Scenario discovery used the patient rule induction method with a minimum coverage of 0.75 and minimum density of 0.80. Results were checked for stability by repeating the analysis on five independent 5,000-member samples; the rule reported for Strategy A was recovered in all five. ↩
  3. 3.Media options for long-term retention of registry records are assessed in DSC-TR-2026-005. A registry would also allow the forecasting record of the Department to be compared with that of simpler reference methods, including persistence and trend extrapolation, on identical quantities. ↩
  4. 4.The structural assessment of interdependencies in DSC-TR-2026-010 finds that containment of the fastest cascade pathway depends on manual fallback procedures that are documented but rarely exercised. This is a further instance of knowledge that exists on paper but not in practice. ↩

Background literature (real-world works)

The following published works are real. They are cited for general scientific and historical context only. They do not support the fictional findings of this document, and their authors are not associated with this project.

  • Lempert, R. J., Popper, S. W., and Bankes, S. C. (2003). Shaping the Next One Hundred Years: New Methods for Quantitative, Long-Term Policy Analysis. RAND Corporation, MR-1626.
  • Tainter, J. A. (1988). The Collapse of Complex Societies. Cambridge University Press.
  • Ord, T. (2020). The Precipice: Existential Risk and the Future of Humanity. Hachette Books.
  • Rosenthal, D. S. H., et al. (2005). A Fresh Look at the Reliability of Long-term Digital Storage. Proceedings of EuroSys 2006 (arXiv:cs/0508130).

Suggested citation

Department of Strategic Continuity, Office of Long-Term Systems Research. Planning Under Deep Uncertainty: Methods for Multi-Decade Continuity Planning. DSC-WP-2026-012. September 2026. https://strategiccontinuity.org/publications/dsc-wp-2026-012 (fictional document).